What should the contractor explain?
Ask who confirms requirements, who applies, which fees are included and who arranges the inspection before covered work is closed. The guide does not use an old published fee schedule as a current quote.
Does trenchless change the need to ask?
A method label does not settle the permit route. Describe the actual repair limits, access points, connections and surface work to the responsible office. Ask how changes discovered during the job affect approvals.
Who covers private locating?
Louisiana 811 distinguishes utility-owned facilities from privately owned lines. Ask whether separate private locating is needed, who arranges it and how the proposed access avoids other facilities.
What records complete the scope?
Request the applicable permit and inspection records with the agreed work scope. Ask what final inspection or recording checks the work and how any separately scheduled restoration will be documented.