One term, different methods.
Trenchless work can reduce the need to open the entire pipe route, but the details depend on the technique and the site. Some methods rehabilitate an existing pipe; others replace it. Ask which method is being proposed and why.
Lining
One method, cured-in-place pipe (CIPP), places a resin-saturated liner inside an existing pipe and cures it in place. Ask how the line will be prepared, where access will be made and how the connections will be handled.
Pipe bursting
Pipe bursting breaks the existing pipe as a new pipe is drawn into its path. It is a replacement method. Ask where the entry and exit points will be, what nearby utilities need to be considered and how the new line will connect.
What must be established first?
The provider needs to assess the line's condition, route, dimensions, access and connections against the requirements of the proposed method. Ask how bends, damaged areas or a low section affect the recommendation. A general description cannot determine eligibility from a distance.
Ask to see the access plan
“Where will equipment enter and exit, what areas may be opened, and what will be restored afterward?”
Connections and completion matter.
A proposal should explain the section covered, how branches and connections are handled, and how the work will be checked and documented afterward. Ask what is excluded and what might change after a closer inspection.
Before excavation or public connection work
Confirm the serving utility and requirements for the address and scope. Louisiana 811 explains that privately owned lines may need separate locating. City permits and inspections may apply to work involving the public system; check current requirements with Hammond Building and the serving utility.
Is trenchless work always no-dig?
No. A method may need access through a cleanout or an excavation. Ask for the proposed access points and surface restoration plan.
Will a liner fix every kind of defect?
No method should be assumed to suit every condition. Ask how the proposed liner addresses the actual findings, including any bends, low areas and connections.